Home> Products > pvc formwork >

pvc plastic formwork on concrete

Monday November-29 2021 09:27:27

Plastic template features:
 
1, smooth and smooth. After demoulding, the surface flatness and smoothness of the concrete structure exceed the technical requirements of the existing clean water formwork, without the need for secondary plastering, saving labor and material.
 
2, light and easy to install. Light weight, strong process adaptability, sawing, planing, drilling, nail, can be composed of any geometric shape, to meet the needs of various shapes of building mold support.
 
3. Demoulding is simple. Concrete non-stick surface, no need for isolator, easy to mold, easy to clean ash.
 
4, stable weather resistance. High mechanical strength, in the temperature of -20~60 degrees Celsius, no shrinkage, no wet swelling, no cracking, no deformation, size stability, alkali resistance, anticorrosion, flame retardant and waterproof, mouse and insect repellent.
 
5, conducive to maintenance. The template does not absorb water and does not require special maintenance or storage.
 
6, strong variability. Types, shapes and specifications can be customized according to the requirements of construction projects.
 
7. Reduce costs. High turnover times, plane mold not less than 30 times, column beam mold not less than 40 times, low use cost.
 
8. Energy saving and environmental protection. All scrap materials and waste templates can be recycled, zero waste discharge.




Previous: period
Next: period